Today
CONTRACTED ASSET OPERATIONSLive availability tracking & telemetry-backed exception queue for PPA & Tolling contracts.
Workspace setup
Complete these steps before relying on daily operational dispatches.
Your identity and asset workspace profile loaded.
Modbus SCADA & ERCOT Market Gateways connected.
Verified thermal stability & warranty cycle limits.
Tools you can evaluate now
These bounded workflows accept real-time SCADA telemetry and market price feeds.
Availability SLA Tracker
Monitor 99.8% plant uptime & contract SLAs.
Open βThermal Fade Engine
Audit CATL/Tesla battery degradation curves.
Open βπ Availability SLA & Outage Penalty Tracker
Real-time plant availability monitoring against 98.0% PPA contractual targets & penalty rules.
12-Month Plant Availability vs 98.0% PPA Baseline
Continuous Synchrophasor Uptime TrackingOutage Log & Downtime Reconciler
Click any row to open the SHA-256 SCADA Proof & Protocol Analyzer Twin| OUTAGE ID | EQUIPMENT UNIT | ROOT CAUSE DIAGNOSTIC | DURATION | SLA PENALTY IMPACT | PPA STATUS | ACTION |
|---|---|---|---|---|---|---|
| #OUT-102 | π BESS Container #3 | HVAC Fan Speed Sensor Fault (Cooler Loop B) | 42 Mins (0.7h) | $0.00 (Within Buffer) | RESOLVED | |
| #OUT-103 | βοΈ PV Inverter #8 | Grid High Voltage Surge Trip (345kV Over-Voltage) | 42 Mins (0.7h) | $0.00 (Force Majeure) | FORCE MAJEURE |
π Thermal & State of Health (SoH) Degradation Engine
Cell-level thermal monitoring and 15-year battery capacity fade forecasting.
15-Year Capacity Fade & Degradation Simulator
Physics Model Liveπ Global Plant-Wide Thermal Guardrails
π‘οΈ BESS Container Infrared Thermal Matrix & Degradation Risk
β‘ LMP Spot Arbitrage & Wholesale Market Bidding Radar
Real-time 5-minute ERCOT & CAISO wholesale electricity market price spikes, net margin math, and Human-in-the-Loop execution bids.
π Real-Time 5-Minute Locational Marginal Price (LMP) Stream
ERCOT South Zone 5-minute spot market clearing vs baseline contractπ Propose 5-Min Wholesale Market Bid
Requires Human Operator Sign-Off before submissionActive ISO Bidding Stack Log
Click any row to inspect clearing evidence, net profit breakdown, & cancel triggers| BID ID | MARKET NODE | TYPE & VOLUME | TARGET LMP | NET MARGIN MATH | STATUS | ACTION |
|---|---|---|---|---|---|---|
| #BID-4491 | ERCOT South Zone | Discharge (25 MW) | $248.50 / MWh | +$210.40/MWh | EXECUTED | |
| #BID-4492 | ERCOT North Zone | Charge (40 MW) | $18.20 / MWh | +$19.90/MWh | PENDING HITL |
π° Marginal Cycling Cost & Trade Profitability Engine
Calculates electro-thermal battery CapEx wear cost per MWh to automatically block unprofitable market trades.
Trade Profitability Gatekeeper Audit Log
Click any row to inspect electro-thermal wear math, SHA-256 evidence, & HITL overrides| TRADE ID | MARKET NODE | SPOT LMP | CYCLING WEAR | NET MARGIN | STATUS | ACTION |
|---|---|---|---|---|---|---|
| #BID-4491 | ERCOT South Zone | $248.50 / MWh | $38.10 / MWh | +$210.40 / MWh | PASSED GATE | |
| #BID-4495 | ERCOT North Zone | $22.00 / MWh | $38.10 / MWh | -$16.10 / MWh | BLOCKED (UNPROFITABLE) |
CapEx & Wear Sensitivity Studio
SENSITIVITY MODELAdjust battery pack replacement CapEx and thermal C-rate wear multipliers to recalculate marginal cost.
π OEM Warranty & Operating Boundary Auditor
Audits throughput & thermal compliance against CATL & Tesla Megapack warranty contracts.
OEM Warranty Log & Verification Package
All operational data logs are cryptographically hashed and audit-ready for Tesla/CATL warranty claims.
π οΈ Autonomous O&M Field Service Dispatch Workstation
Diagnostic ticket generation, spare parts inventory sync, and Salesforce / IBM Maximo Field Service dispatch.
β‘ Dispatch New Field Work Order
Instant Integration with Salesforce & IBM MaximoActive Field Dispatches & Work Orders
Click any row to open the Work Order Evidence & LOTO Twin| TICKET ID | ASSET UNIT | DIAGNOSTIC TRIGGER | ASSIGNED TECH | STATUS | ACTION |
|---|---|---|---|---|---|
| #WO-9081 | π Container #3 | HVAC Fan Speed Sensor Anomaly | Mark Vance (On-Site) | DISPATCHED | |
| #WO-9082 | βοΈ PV Inverter #8 | Dust Filter & Airflow Restriction | Sarah Connor (On-Site) | COMPLETED |
π€οΈ ERCOT & CAISO Quant Machine Learning Forecast Engine
Neural solar/wind irradiance prediction, 24-hour Day-Ahead nodal LMP price curve, and Monte Carlo risk-adjusted bidding curves.
π 24-Hour Day-Ahead Price Curve vs Real-Time Spot & Solar Irradiance
Simulated Nodal Price Vector across ERCOT West, ERCOT South, & Houston HubDay-Ahead Wholesale Price Projections & BESS Dispatch
Click any row to open the Nodal Interval Telemetry & Neural Model Attribution Twin| INTERVAL / TIME | NODAL ZONE | FORECAST LMP | RENEWABLE GEN | DISPATCH RECOMMENDATION | ACTION |
|---|---|---|---|---|---|
| 12:00 PM (Solar Peak) | ERCOT West Zone | $14.20 / MWh | 395.2 MW Solar | FULL CHARGE (1.0C) | |
| 02:00 PM (Midday Hold) | ERCOT West Zone | $28.50 / MWh | 410.0 MW Solar | STANDBY / HOLD SOC | |
| 06:30 PM (Net Load Peak) | ERCOT South Zone | $248.50 / MWh | 45.1 MW Wind | DISCHARGE MAX (2.0C) | |
| 08:00 PM (Late Peak) | ERCOT Houston Hub | $185.00 / MWh | 0.0 MW Solar | DISCHARGE (1.2C) |
Quant Model Sensitivity Studio
NEURAL TUNERAdjust real-time neural weights for solar cloud cover, wind ramp speeds, and thermal plant trips.
π Bilateral PPA, Heat Rate Call Options & Financial Hedges
Structure, track, and settle synthetic battery energy hedges, heat rate call options, and fixed-for-floating swap contracts.
Active Financial Derivatives & PPA Portfolio
Click any hedge row to inspect ISDA master agreement details, settlement math, & collateral margin| DEAL ID | INSTRUMENT TYPE | COUNTERPARTY | VOLUME (MW) | STRIKE PRICE | EXPIRY DATE | MTM VALUE | STATUS | ACTION |
|---|---|---|---|---|---|---|---|---|
| #HDG-8810 | Fixed-for-Floating Swap | Morgan Stanley Commodities (A+) | 20 MW | $45.00 / MWh | Dec 31, 2026 | +$85,200 | ACTIVE | |
| #HDG-8811 | Heat Rate Call Option | Vitol Energy Trading (A) | 15 MW | 10.5 MMBtu/MWh | Nov 30, 2026 | +$57,650 | ACTIVE | |
| #HDG-8812 | Virtual PPA Settlement | Constellation Energy (BBB+) | 10 MW | $38.50 / MWh | Jun 30, 2027 | +$14,000 | ACTIVE |
Conversations
π Agent Operational Assignments
Active tasks assigned to The Operator & The Analyst.
| Assignment ID | Task Description | Asset Target | Status | Deadline |
|---|---|---|---|---|
| #ASN-01 | Monitor thermal balance & HVAC chiller rate | BESS Container #3 | In Progress | Continuous |
| #ASN-02 | 5-Minute ERCOT LMP Spot Bid Optimization | ERCOT South Zone | Active Engine | Real-time |
ποΈ Agent Shared Workspace & Telemetry Data
π Agent Audit & Execution Activity
| Timestamp | Agent | Action Executed | Outcome |
|---|---|---|---|
| 16:04:12 | The Operator | Curtail Container #3 Charge Rate to 0.5C | Success |
| 15:58:30 | The Analyst | Placed Day-Ahead Bid @ $248.50/MWh | Matched |
π Integrations
Connect the apps your agent should use. Search the catalog below, connect one, and it's available to your agent immediately.
CONNECTED INTEGRATIONS (2)
Modbus SCADA Gateway
β READY INTEGRATIONConnected and ready for approved agent work.
ERCOT Market Gateway
β READY INTEGRATIONConnected and ready for approved market bid execution.
BROWSE APPS (COMPOSIO)
FEATURED APPS
πΊοΈ Physical SCADA Site Twin & 2D Layout
Interactive spatial digital twin of 12 Megapack BESS containers, inverter banks, and main transformer substation.
BESS Container Nodes (Click node to inspect live telemetry drawer)
π§Ύ Monthly Utility PPA & ISO Settlement Reconciler
Reconcile physical revenue meter MWh logs against monthly utility PPA capacity invoices & ISO shadow billing statements.
Monthly Line-Item Statement & Revenue Meter Log Audit
Comparison of utility revenue meters (ERCOT / CAISO EPS meters) against monthly PPA capacity charges & ISO shadow invoices.
| Statement ID | Billing Period | Utility / Offtaker | Delivered MWh | Capacity Payment | Energy Credit | Discrepancy & Context | Inline Action |
|---|---|---|---|---|---|---|---|
| #SET-9910 | Aug 2026 (Monthly Final) | CenterPoint / ERCOT | 4,120.40 MWh | $480,000.00 | $142,850.00 |
Reconciled (0% Variance)
100% matched against 15-min EPS meter log.
|
|
| #SET-9911 | Sep 2026 (Mid-Month Draft) | CenterPoint / ERCOT | 1,840.12 MWh | $240,000.00 | $38,100.00 |
β οΈ -$14,200.00 Variance
Why: ERCOT shorted Sep 12 peak credit.
Outcome: Dispute recovers $14.2k revenue. |
|
| #SET-9909 | Jul 2026 (Monthly Final) | CenterPoint / ERCOT | 4,510.80 MWh | $480,000.00 | $184,200.00 |
Reconciled (0% Variance)
Matched against 15-min EPS meter log.
|
π Autonomous AI Agent Marketplace & Specialization Library
Deploy specialized energy AI agents for grid dispatch, battery degradation modeling, PPA settlement, and FERC/ISO compliance.
The Operator
OPERATIONS & SAFETY SPECIALISTContinuous 1-second Modbus SCADA telemetry monitoring, BMS thermal runaway prevention, DNP3 protocol link audit, and autonomous Salesforce/Maximo O&M field technician dispatch.
The Analyst
QUANT & ARBITRAGE SPECIALISTReal-time 5-minute ERCOT & CAISO LMP spot price spike detection, Day-Ahead vs Real-Time spread modeling, PPA settlement discrepancy auditing, and synthetic swap valuation.
Degradation Guardian
SOH & WARRANTY PROTECTIONSimulates electro-thermal lithium plating risk, calculates C-rate cycling wear cost ($/MWh), and enforces OEM battery warranty guardrails (CATL, Tesla Megapack, BYD).
Regulatory Compliance Bot
FERC & NERC CIP AUDITORAutomates NERC CIP cyber-security event logging, compiles FERC Form 552 filings, and enforces IEEE 1547 grid interconnection compliance rules for utility solar/storage.
Solar & Wind Forecast Agent
ATMOSPHERIC NEURAL ENGINEConnects ECMWF weather satellite feeds with PV solar irradiance sensors to predict cloud-cover ramps and wind turbine curtailments 24 hours ahead.
PPA Settlement & Dispute Agent
CONTRACT & REVENUE RECOVERYMonitors monthly utility billing statements against 15-minute EPS revenue meter logs, auto-drafting ISO market dispute tickets to eliminate revenue leakage.
βοΈ System Settings & Domain Governance
Hardware Boundary Guardrails, Wholesale Market Parameters, & AI Agent Safety Limits