⚑ SLOE ENERGY AGENTIC OS Utility Asset Digital Twin & Market Dispatch Protocol
⚑ SCADA Live

Development preview. SCADA telemetry feeds, BESS container sensors, and wholesale ERCOT/CAISO market gateways active.

Today

CONTRACTED ASSET OPERATIONS

Live availability tracking & telemetry-backed exception queue for PPA & Tolling contracts.

08:00 AM MORNING FOCUS Container #3 Thermal Drift Detected (42.1Β°C). Curtail Charge Rate to 0.5C before 09:00 AM Peak.

Workspace setup

Complete these steps before relying on daily operational dispatches.

βœ“
Account active

Your identity and asset workspace profile loaded.

βœ“
Add a trusted data source

Modbus SCADA & ERCOT Market Gateways connected.

β—‹
Review the first evidence-backed result

Verified thermal stability & warranty cycle limits.

Tools you can evaluate now

These bounded workflows accept real-time SCADA telemetry and market price feeds.

πŸ“Š

Availability SLA Tracker

Monitor 99.8% plant uptime & contract SLAs.

Open β†’
πŸ›‘οΈ

Thermal Fade Engine

Audit CATL/Tesla battery degradation curves.

Open β†’
πŸ“₯

Today's review queue

Evidence-backed exceptions requiring a human decision, ordered by severity and deadline.

πŸ“Š Availability SLA & Outage Penalty Tracker

Real-time plant availability monitoring against 98.0% PPA contractual targets & penalty rules.

πŸ€– AGENT OPERATOR SLA CONTRACTUAL ADVISORY PPA Section 14.2 Ledger Verified

🟒 SLA Compliance Nominal: Plant availability is operating at 99.82% (+1.82% above 98.0% PPA requirement). Excusable Grid Force Majeure classification on #OUT-103 successfully protected $8,750 in potential utility outage penalties.

PLANT AVAILABILITY +1.82% VS PPA
99.82% Target: 98.00% PPA Minimum
UNPLANNED DOWNTIME 8.0% USED
1.4 Hrs Allowed: 17.5 Hrs / Quarter
PENALTY RISK ACCRUED $0 PENALTIES
$0.00 Saved $8,750 via Force Majeure
OFFTAKER PPA STATUS AUDIT PASS
COMPLIANT PPA Section 14.2 Verified

12-Month Plant Availability vs 98.0% PPA Baseline

Continuous Synchrophasor Uptime Tracking
LEDGER VERIFIED
DOWNTIME BUFFER COUNTDOWN 16.1 HRS SAFE
PPA OUTAGE PENALTY FORMULA (SECTION 14.2)
Penalty = max(0, Downtime - 17.5h) Γ— $12,500/hr
Current Status: 1.4h Used / 16.1h Safe Buffer Remaining

Outage Log & Downtime Reconciler

Click any row to open the SHA-256 SCADA Proof & Protocol Analyzer Twin
2 RECONCILED EVENTS
OUTAGE ID EQUIPMENT UNIT ROOT CAUSE DIAGNOSTIC DURATION SLA PENALTY IMPACT PPA STATUS ACTION
#OUT-102 πŸ”‹ BESS Container #3 HVAC Fan Speed Sensor Fault (Cooler Loop B) 42 Mins (0.7h) $0.00 (Within Buffer) RESOLVED
#OUT-103 β˜€οΈ PV Inverter #8 Grid High Voltage Surge Trip (345kV Over-Voltage) 42 Mins (0.7h) $0.00 (Force Majeure) FORCE MAJEURE

πŸ“‰ Thermal & State of Health (SoH) Degradation Engine

Cell-level thermal monitoring and 15-year battery capacity fade forecasting.

πŸ€– AGENT OPERATOR LIFE-EXTENSION ADVISORY Physics Simulation Active

🟒 Optimal Lifetime Strategy: Maintaining HVAC target at 22Β°C with a 1.2 C-Rate cap projects 86.5% State of Health (SoH) at Year 10β€”extending battery warranty payout by +$1.4M above CATL's 70% threshold.

15-Year Capacity Fade & Degradation Simulator

Physics Model Live

🌐 Global Plant-Wide Thermal Guardrails

🌑️ BESS Container Infrared Thermal Matrix & Degradation Risk

THERMAL GRADIENT: 30.0Β°C – 35.0Β°C (Nominal Cool) 35.1Β°C – 38.0Β°C (Elevated Warm) 38.1Β°C+ (Hot / Accelerated Fade)

⚑ LMP Spot Arbitrage & Wholesale Market Bidding Radar

Real-time 5-minute ERCOT & CAISO wholesale electricity market price spikes, net margin math, and Human-in-the-Loop execution bids.

πŸ€– AGENT ANALYST WHOLESALE ARBITRAGE ADVISORY ERCOT South Node Live (5-Min Clearing)

🟒 Price Surge Opportunity Flagged: ERCOT South Zone LMP spiked +840% to $248.50 / MWh. Subtracting battery degradation cycling wear ($38.10/MWh) yields a +$210.40 / MWh Net Profit Spread. Human Sign-Off Required before 03:42 Gate Lock.

LIVE 5-MIN SPOT LMP +840% SPIKE
$248.50 / MWh ERCOT South Interconnect Node
NET ARBITRAGE SPREAD +$5,260 NET PnL
+$210.40 / MWh After $38.10/MWh Battery Degradation
5-MIN ISO GATE COUNTDOWN GATE OPEN
03:42 Gate Closes for Interval #184
ACTIVE MARKET BIDS 1 PENDING HITL
2 Stack Bids 1 Executed | 1 Pending Sign-Off

πŸ“ˆ Real-Time 5-Minute Locational Marginal Price (LMP) Stream

ERCOT South Zone 5-minute spot market clearing vs baseline contract
⚑ REAL-TIME NET ARBITRAGE MARGIN MATH (MANDATORY HITL DISPATCH GUARDRAIL)
SPOT LMP PRICE$248.50 / MWh
βˆ’
CELL WEAR COST$38.10 / MWh
=
NET PROFIT SPREAD+$210.40 / MWh
HUMAN SIGN-OFF REQUIRED: Click button to open verification drawer & approve submission to ERCOT Gateway.

πŸ“ Propose 5-Min Wholesale Market Bid

Requires Human Operator Sign-Off before submission
HITL GATE ACTIVE

Active ISO Bidding Stack Log

Click any row to inspect clearing evidence, net profit breakdown, & cancel triggers
ERCOT GATEWAY CONNECTED
BID ID MARKET NODE TYPE & VOLUME TARGET LMP NET MARGIN MATH STATUS ACTION
#BID-4491 ERCOT South Zone Discharge (25 MW) $248.50 / MWh +$210.40/MWh EXECUTED
#BID-4492 ERCOT North Zone Charge (40 MW) $18.20 / MWh +$19.90/MWh PENDING HITL

πŸ’° Marginal Cycling Cost & Trade Profitability Engine

Calculates electro-thermal battery CapEx wear cost per MWh to automatically block unprofitable market trades.

πŸ€– AGENT ANALYST TRADE PROFITABILITY ADVISORY CATL & Tesla Electro-Thermal Physics Engine Live

🟒 Trade Gatekeeper Protection Active: Marginal cycling wear cost calculated at $38.10 / MWh (based on $130/kWh LFP CapEx & 6,000 cycle rating). Successfully blocked 1 negative-margin trade (#BID-4495 @ $22.00/MWh LMP) to prevent +$1,610 in uncompensated battery degradation.

MARGINAL WEAR COST $130/kWh CAPEX
$38.10 / MWh Calculated Battery Wear Cost
NET PROFIT SPREAD +84.7% MARGIN
+$210.40 / MWh LMP $248.50 βˆ’ Wear $38.10
GATEKEEPER BLOCKED TRADES +$1,610 SAVED
1 Blocked Negative Margin Trade Blocked
REMAINING CYCLE RESERVE 83.5% SOH
3,650 EFC Warranty Reserve Yr 3 of 15

Trade Profitability Gatekeeper Audit Log

Click any row to inspect electro-thermal wear math, SHA-256 evidence, & HITL overrides
AUTOMATED GATEKEEPER ACTIVE
TRADE ID MARKET NODE SPOT LMP CYCLING WEAR NET MARGIN STATUS ACTION
#BID-4491 ERCOT South Zone $248.50 / MWh $38.10 / MWh +$210.40 / MWh PASSED GATE
#BID-4495 ERCOT North Zone $22.00 / MWh $38.10 / MWh -$16.10 / MWh BLOCKED (UNPROFITABLE)

CapEx & Wear Sensitivity Studio

SENSITIVITY MODEL

Adjust battery pack replacement CapEx and thermal C-rate wear multipliers to recalculate marginal cost.

πŸ“œ OEM Warranty & Operating Boundary Auditor

Audits throughput & thermal compliance against CATL & Tesla Megapack warranty contracts.

ANNUAL FULL CYCLES (EFC)312 EFCLimit: 365 EFC / Year
WARRANTY COMPLIANCE100%Zero Contract Violations
MAX TEMP VIOLATIONS0Cutoff: 45.0Β°C Max
OEM AUDIT STATUSPASSEDCATL / Tesla Verified

OEM Warranty Log & Verification Package

All operational data logs are cryptographically hashed and audit-ready for Tesla/CATL warranty claims.

πŸ› οΈ Autonomous O&M Field Service Dispatch Workstation

Diagnostic ticket generation, spare parts inventory sync, and Salesforce / IBM Maximo Field Service dispatch.

πŸ€– AGENT OPERATOR FIELD SERVICE ADVISORY Salesforce Field Service & IBM Maximo Live

🟒 Field Readiness Nominal: 2 Field Technicians active on-site. Spare parts inventory confirmed for BESS Container #3 HVAC Sensor (Warehouse 4 - Bin B12). P1 SLA Response Target: < 45 Mins.

ACTIVE DISPATCHES 1 P1 | 1 P2
2 Work Orders 1 In-Progress | 1 Completed
ON-SITE TECHNICIANS 2 ACTIVE
2 Active Mark Vance & Sarah Connor
SPARE PARTS IN STOCK WAREHOUSE 4
98.4% Inventory & LOTO Certs Verified
MEAN TIME TO REPAIR (MTTR) PASS (< 60m)
38.2 Mins Target: < 60 Mins Standard

⚑ Dispatch New Field Work Order

Instant Integration with Salesforce & IBM Maximo
SALESFORCE SYNC

Active Field Dispatches & Work Orders

Click any row to open the Work Order Evidence & LOTO Twin
MAXIMO INTEGRATED
TICKET ID ASSET UNIT DIAGNOSTIC TRIGGER ASSIGNED TECH STATUS ACTION
#WO-9081 πŸ”‹ Container #3 HVAC Fan Speed Sensor Anomaly Mark Vance (On-Site) DISPATCHED
#WO-9082 β˜€οΈ PV Inverter #8 Dust Filter & Airflow Restriction Sarah Connor (On-Site) COMPLETED

🌀️ ERCOT & CAISO Quant Machine Learning Forecast Engine

Neural solar/wind irradiance prediction, 24-hour Day-Ahead nodal LMP price curve, and Monte Carlo risk-adjusted bidding curves.

πŸ€– AGENT ANALYST QUANT ARBITRAGE ADVISORY ECMWF & ERCOT Nodal ML Engine Live

🟒 High-Margin Arbitrage Horizon: 24-Hour Day-Ahead / Real-Time spread projected at $234.30 / MWh. Solar curtailment at 12:30 PM ($14.20/MWh) offers prime 1.0C charge window before 06:30 PM Net Load Peak ($248.50/MWh).

24-HR DA/RT LMP SPREAD 18:00 - 21:00 PEAK
$234.30 / MWh Max Arbitrage Margin Window
SOLAR & WIND RAMP PEAK 12:30 PM MAX
420.5 MW Peak ERCOT West Irradiance Forecast
MODEL CONFIDENCE SCORE RMSE $1.42/MWh
96.4% Ensemble Model Accuracy
TRANSMISSION CONGESTION BINDING -$42.10
HIGH RISK South-to-North Constraint

πŸ“ˆ 24-Hour Day-Ahead Price Curve vs Real-Time Spot & Solar Irradiance

Simulated Nodal Price Vector across ERCOT West, ERCOT South, & Houston Hub
NEURAL ENSEMBLE LIVE

Day-Ahead Wholesale Price Projections & BESS Dispatch

Click any row to open the Nodal Interval Telemetry & Neural Model Attribution Twin
4 NODAL NODES ACTIVE
INTERVAL / TIME NODAL ZONE FORECAST LMP RENEWABLE GEN DISPATCH RECOMMENDATION ACTION
12:00 PM (Solar Peak) ERCOT West Zone $14.20 / MWh 395.2 MW Solar FULL CHARGE (1.0C)
02:00 PM (Midday Hold) ERCOT West Zone $28.50 / MWh 410.0 MW Solar STANDBY / HOLD SOC
06:30 PM (Net Load Peak) ERCOT South Zone $248.50 / MWh 45.1 MW Wind DISCHARGE MAX (2.0C)
08:00 PM (Late Peak) ERCOT Houston Hub $185.00 / MWh 0.0 MW Solar DISCHARGE (1.2C)

Quant Model Sensitivity Studio

NEURAL TUNER

Adjust real-time neural weights for solar cloud cover, wind ramp speeds, and thermal plant trips.

πŸ“œ Bilateral PPA, Heat Rate Call Options & Financial Hedges

Structure, track, and settle synthetic battery energy hedges, heat rate call options, and fixed-for-floating swap contracts.

πŸ€– AGENT ANALYST PPA & DERIVATIVES ADVISORY ISDA Master Agreements & ICE Futures Live

🟒 Portfolio Risk Profile Optimal: 65.0% of 120 MW battery capacity hedged under Fixed Swap ($42.50/MWh) & HRCO contracts. Mark-to-Market (MTM) portfolio gain is +$142,850. Recommendation: Execute 10 MW Q4 Peak Swap to lock in $46.80/MWh forward curves before market liquidity dries.

HEDGE COVERAGE RATIO 35% OPEN MERCHANT
65.0% 78 MW Hedged | 42 MW Open Spot
WEIGHTED STRIKE PRICE SWAP TARGET
$42.50 / MWh Fixed-for-Floating Swap Floor
NET MTM PORTFOLIO PnL ICE GAIN
+$142,850 Mark-to-Market Valuation
COUNTERPARTY CREDIT ISDA MASTER
A+ RATED Morgan Stanley & Vitol Standard

Active Financial Derivatives & PPA Portfolio

Click any hedge row to inspect ISDA master agreement details, settlement math, & collateral margin
3 ACTIVE CONTRACTS
DEAL ID INSTRUMENT TYPE COUNTERPARTY VOLUME (MW) STRIKE PRICE EXPIRY DATE MTM VALUE STATUS ACTION
#HDG-8810 Fixed-for-Floating Swap Morgan Stanley Commodities (A+) 20 MW $45.00 / MWh Dec 31, 2026 +$85,200 ACTIVE
#HDG-8811 Heat Rate Call Option Vitol Energy Trading (A) 15 MW 10.5 MMBtu/MWh Nov 30, 2026 +$57,650 ACTIVE
#HDG-8812 Virtual PPA Settlement Constellation Energy (BBB+) 10 MW $38.50 / MWh Jun 30, 2027 +$14,000 ACTIVE
Sloe Energy OS. / The Operator
T

The Operator

β–Ύ
βš™οΈ Operations Specialist β€’ Online

Conversations

πŸ“… Agent Operational Assignments

Active tasks assigned to The Operator & The Analyst.

Assignment IDTask DescriptionAsset TargetStatusDeadline
#ASN-01Monitor thermal balance & HVAC chiller rateBESS Container #3In ProgressContinuous
#ASN-025-Minute ERCOT LMP Spot Bid OptimizationERCOT South ZoneActive EngineReal-time

πŸ—„οΈ Agent Shared Workspace & Telemetry Data

[SYSTEM]: Sloe Energy OS Agent Engine initialized. 3 Agents active on live grid stream.

πŸ“‹ Agent Audit & Execution Activity

TimestampAgentAction ExecutedOutcome
16:04:12The OperatorCurtail Container #3 Charge Rate to 0.5CSuccess
15:58:30The AnalystPlaced Day-Ahead Bid @ $248.50/MWhMatched

πŸ”Œ Integrations

Connect the apps your agent should use. Search the catalog below, connect one, and it's available to your agent immediately.

CONNECTED2Apps that have actually completed auth.
READY FOR AGENT USE2Connected, scoped, tools exposed, and smoke tested.
NEEDS REPAIR0Reconnect or approve access before an agent relies on it.
LIVE IMPORTS3Sheets and files already mapped into workspace screens.

CONNECTED INTEGRATIONS (2)

⚑

Modbus SCADA Gateway

βœ“ READY INTEGRATION
🟒 Ready

Connected and ready for approved agent work.

πŸ“ˆ

ERCOT Market Gateway

βœ“ READY INTEGRATION
🟒 Ready

Connected and ready for approved market bid execution.

BROWSE APPS (COMPOSIO)

πŸ—ΊοΈ Physical SCADA Site Twin & 2D Layout

Interactive spatial digital twin of 12 Megapack BESS containers, inverter banks, and main transformer substation.

⚑ Interconnection Substation & 345kV Grid Bus (ERCOT South Interconnect)

SYNCHRONIZED TO GRID

Total Output: 120 MW / 240 MWh | Grid Freq: 59.98 Hz | Bus Volt: 345.2 kV | Transformer Temp: 48.2Β°C

πŸ”Œ345kV Grid Interconnect
⚑150MVA Main Transformer T1
πŸ”‹34.5kV BESS Collector Feeder A & B

BESS Container Nodes (Click node to inspect live telemetry drawer)

🧾 Monthly Utility PPA & ISO Settlement Reconciler

Reconcile physical revenue meter MWh logs against monthly utility PPA capacity invoices & ISO shadow billing statements.

πŸ€– AGENT ANALYST ISO SETTLEMENT & RECONCILIATION ADVISORY ERCOT EPS Revenue Meter & ISO Shadow Engine Live

🟒 Shadow Reconciliation Complete: August final statement #SET-9910 reconciled with 0% meter variance ($622,850 payable). Mid-Month Draft #SET-9911 flagged -$14,200.00 Variance due to ERCOT shorting Sep 12 peak interval credits. Action: Submit formal ISO dispute before 17:00 Gate Lock to recover $14.2k.

FIXED CAPACITY INVOICE 120 MW
$480,000.00
Contracted Capacity $4,000/MW-mo
VARIABLE ENERGY CREDITS 4,120 MWh
+$142,850.00
Revenue Metered Avg $34.67/MWh
LIQUIDATED DAMAGES (LD) ZERO PENALTY
$0.00
Target Uptime: 98.0% Actual: 99.82%
NET MONTHLY PAYABLE 1 DISPUTE ACTIVE
$622,850.00
ISO Shadow Reconciliation $14.2k Variance Flagged

Monthly Line-Item Statement & Revenue Meter Log Audit

Comparison of utility revenue meters (ERCOT / CAISO EPS meters) against monthly PPA capacity charges & ISO shadow invoices.

Statement ID Billing Period Utility / Offtaker Delivered MWh Capacity Payment Energy Credit Discrepancy & Context Inline Action
#SET-9910 Aug 2026 (Monthly Final) CenterPoint / ERCOT 4,120.40 MWh $480,000.00 $142,850.00 Reconciled (0% Variance)
100% matched against 15-min EPS meter log.
#SET-9911 Sep 2026 (Mid-Month Draft) CenterPoint / ERCOT 1,840.12 MWh $240,000.00 $38,100.00 ⚠️ -$14,200.00 Variance
Why: ERCOT shorted Sep 12 peak credit.
Outcome: Dispute recovers $14.2k revenue.
#SET-9909 Jul 2026 (Monthly Final) CenterPoint / ERCOT 4,510.80 MWh $480,000.00 $184,200.00 Reconciled (0% Variance)
Matched against 15-min EPS meter log.

πŸ“š Autonomous AI Agent Marketplace & Specialization Library

Deploy specialized energy AI agents for grid dispatch, battery degradation modeling, PPA settlement, and FERC/ISO compliance.

O

The Operator

OPERATIONS & SAFETY SPECIALIST
ACTIVE (SYS)

Continuous 1-second Modbus SCADA telemetry monitoring, BMS thermal runaway prevention, DNP3 protocol link audit, and autonomous Salesforce/Maximo O&M field technician dispatch.

Modbus TCP DNP3 IEEE 1815 Salesforce FS
A

The Analyst

QUANT & ARBITRAGE SPECIALIST
ACTIVE (SYS)

Real-time 5-minute ERCOT & CAISO LMP spot price spike detection, Day-Ahead vs Real-Time spread modeling, PPA settlement discrepancy auditing, and synthetic swap valuation.

ERCOT API CAISO Oasis PPA Shadows
D

Degradation Guardian

SOH & WARRANTY PROTECTION
STANDBY

Simulates electro-thermal lithium plating risk, calculates C-rate cycling wear cost ($/MWh), and enforces OEM battery warranty guardrails (CATL, Tesla Megapack, BYD).

PyBaMM Physics Tesla Warranty
R

Regulatory Compliance Bot

FERC & NERC CIP AUDITOR
STANDBY

Automates NERC CIP cyber-security event logging, compiles FERC Form 552 filings, and enforces IEEE 1547 grid interconnection compliance rules for utility solar/storage.

NERC CIP-007 FERC E-Filing
F

Solar & Wind Forecast Agent

ATMOSPHERIC NEURAL ENGINE
STANDBY

Connects ECMWF weather satellite feeds with PV solar irradiance sensors to predict cloud-cover ramps and wind turbine curtailments 24 hours ahead.

ECMWF Satellite PVlib Python
S

PPA Settlement & Dispute Agent

CONTRACT & REVENUE RECOVERY
STANDBY

Monitors monthly utility billing statements against 15-minute EPS revenue meter logs, auto-drafting ISO market dispute tickets to eliminate revenue leakage.

EPS Meter Telemetry ISO Settlement API

βš™οΈ System Settings & Domain Governance

Hardware Boundary Guardrails, Wholesale Market Parameters, & AI Agent Safety Limits

βš™οΈ ACTIVE GOVERNANCE PROFILE CONTRACTED ASSET MODE ACTIVE

🟒 PPA Compliance Guardrails Engaged: 99.8% Availability SLA floor & CATL 45.0°C thermal ceiling actively enforced by SCADA Modbus gateway.

πŸ“‹ Contracted PPA & SCADA Guardrails

PPA Availability SLAs, Thermal Cutoffs & Warranty Boundaries
CONTRACTED

⚑ Merchant Wholesale Market Parameters

ERCOT/CAISO LMP Spread Floor, Degradation Math & ISO Gateways
MERCHANT

🌐 Platform Infrastructure & Domain Routing

Cloudflare Edge Workers Deployment & Security Endpoints
SYSTEM ONLINE

Inspection Drawer

⚑ SLOE ENERGY AGENTIC OS INITIALIZATION

Select Operating Market Governance

Select your utility asset's primary commercial structure to configure your workspace

You can switch modes anytime using the topbar workspace switcher.